# Monthly progress report, September 2026

*Project controls. Sample document: synthetic data.*

Tower A, Tower B and the Podium went from bare ground in March to structure in September.

Tower B has the most open defects (formwork and rebar); a quality stand-down was held on 14 September.

| Zone | Progress | Issue |
| --- | --- | --- |
| Foundations and basement | complete | settlement at the north edge |
| Tower B | level 12 | defects |
| Laydown yard | active | spoil pile to remove |

Settlement points along the excavation edge near 24.49742, 54.39647 are being watched.