The 2025 in-line inspection of Line 100 crude confirms active external corrosion at the low spot where the line crosses the draw near 31.97837, -102.14691; the deepest metal loss grew by about 9 points per run.

Cathodic protection potentials at the nearby test stations have drifted less negative since 2023.

| Line | Finding | Response |
| --- | --- | --- |
| Line 100 crude | metal loss growth at the draw | dig and recoat in 2026 |
| Line 200 gas | dents near Highway rest area | monitor |
| Line 300 NGL lateral | no growth | rerun 2028 |

Mesa Verde colonia and the County school campus remain the highest consequence areas along Line 100 crude.