Compute change raster

im_compute_change_raster

Imageryran in 3 samples5 images
What it does

Compute change raster. Pixel value or spectral change between two co-registered images: difference, relative difference, absolute difference, log ratio (radar, dB), Euclidean spectral distance, spectral angle (radians) or the band with most change. Clouds and shadows are masked when the images have a scene classification band. (ArcGIS: Compute Change Raster (pixel value change, spectral change))

The ArcGIS Pro tools it stands for

  • Compute Change Raster (Image Analyst, Change Detection)

From the product's Esri parity register.

Agriculture Fresno County, California, United States

1 call succeeded. 1 output layer on the sample's interactive map.

Difference Satellite scene 2026-04-15 to Satellite scene 2026-08-15
Difference Satellite scene 2026-04-15 to Satellite scene 2026-08-15map

Conservation Okavango Delta near Maun, Botswana

2 calls succeeded. 2 output layers on the sample's interactive map.

Difference Habitat scene 2020-09-15 to Habitat scene 2025-09-15
Difference Habitat scene 2020-09-15 to Habitat scene 2025-09-15map
Change Analysis: Difference Habitat scene 2020-09-15 to Habitat scene 2025-09-15
Change Analysis: Difference Habitat scene 2020-09-15 to Habitat scene 2025-09-15map

Construction Al Reem Island, Abu Dhabi, United Arab Emirates

2 calls succeeded. 2 output layers on the sample's interactive map.

Difference Site progress scene 2026-03-01 to Site progress scene 2026-09-01
Difference Site progress scene 2026-03-01 to Site progress scene 2026-09-01map
Site Progress Scene Index Analysis Difference Site progress scene 2026-03-01 to Site progress scene 2026-09-01
Site Progress Scene Index Analysis Difference Site progress scene 2026-03-01 to Site progress scene 2026-09-01map